
PCB & FPC fabrication
Rigid, flexible and rigid-flex circuits from 1 to 32 layers, minimum line and space 0.06 mm, on panels up to 650 × 1,100 mm.
- 1–32 layers
- 650 × 1,100 mm
PCBA · PCB · FPC Bao'an, Shenzhen Est. 2005
PCB and FPC fabrication, component sourcing, SMT and DIP assembly, and functional test — under one roof. One quote, one lead time, one party accountable for defects. No minimum order quantity.

Rigid, flexible and rigid-flex circuits from 1 to 32 layers, minimum line and space 0.06 mm, on panels up to 650 × 1,100 mm.

24 SMT lines placing passives from 01005 to 2512 and BGA down to 0.3 mm pitch, with 3D SPI before placement and AOI after reflow.

Six DIP lines for connectors and through-hole parts, so mixed-technology boards are assembled and soldered without leaving the building.

Turnkey or consigned. Sharp, Toshiba, STMicroelectronics, Samsung, Infineon, JRC and NEC — plus replacement sourcing for obsolete parts.

26 AOI systems, 3D X-ray for hidden joints, six test lines, FAI and BGA rework — with IATF 16949 and ISO 13485 documentation handled by the certified partner plants behind them.
An engineer reads both before the quote goes out, and tells you what we would change — before you have paid us anything.
Bare board
Everything on this list is made on our own line in Bao'an. We do not broker your board out to a third-party fab house and put our name on it — a prototype board leaves in 3–4 days and mass production in 8–16, with an expedited prototype in as little as 24 hours.
Or straight to one: FR-4 and high-Tg · flex and rigid-flex · HDI build-up · aluminium and heavy copper · high-frequency laminates
Before, during, after
Four checkpoints in the order they happen — three of them while the boards are still ours. The first one runs before you have paid us anything.
Industries
Most PCB shops list ten industries on the home page. We list the three where a specific certificate is what makes it possible for a regulated buyer to use a factory this size at all.
Automotive 01 / 03
Boards off our lines
A sample of the assemblies we run — no renders, no stock photography.









Certifications
Every mark here is a real certificate, not a claim — the issuing body and the certificate number sit with it, and the scan is on file. IATF 16949 sits with the partner plant that holds it, and its certificate goes out with the quote.
Resources
How to specify, quote and test a board — and what a particular kind of board demands of the process.
Quote prep
The three things a quote actually needs, the four that make the price accurate, and the DFM report you should have back within 24 hours.
Surface finish
What each finish costs, how long it stores, and which applications each one is actually right for.
Application note
Why a power board fails before it is built — and what to ask a supplier before you order one.
Guides for specifying a board, notes on what a board demands.
Common questions
Yes. There is no minimum order quantity — 1 piece of PCB or PCBA is fine. It is how you validate a design in your own hands before committing to a run.
We reply within 2 hours and issue the quote within 24. A large or unusual assembly BOM can take up to 48 hours, and we will tell you when that applies.
Assembly: 7 days up to 5 units, 14 days up to 1,000, 21 days up to 10,000. A bare board is faster — 3–4 days for a prototype.
ISO 9001 and IPC-A-610 Class III in our own plant. IATF 16949 for automotive and ISO 13485 for medical are held by the certified partner plants we build through, and we send their certificate copies with any quote, along with UL, RoHS and CE. If your product is regulated, tell us at the quote stage.
Yes. We buy through our own supply chain, so a bare board and a BOM come back as a finished assembly. You can also supply your own parts, or mix the two.
Yes. Our customers are in Europe, the Americas and Asia. Tell us your destination at the quote stage and we confirm the shipping method and transit time.
Send us your files
Upload your Gerber files and BOM. We come back within 24 hours — whether you need 1 board or 10,000.
It is with the quoting team now. The reply will land at within 2 hours.
Your reference is — quote it if you need to chase us.